Wind Turbines, El Cabo Wind Farm, Torrance County, New Mexico
Photo taken along US Highway 60 between Encino and Willard
Gemesa G114/2100 turbines: 2.1 MW, 114 m / 374 ft diameter blades, 95 m / 311 ft hub height, total nominally 142 turbines for 298 MW
March 14, 2018
Canon 5D Mark II, EF 24 - 105 mm @ 88 mm
Size of Original: 1702 x 2614 pixels